HuHuGam Heritage Center – Upgrade

Upgrading defective detailing in Curtain Wall and Roof Installation from original Architect.

$500K Project designed with the assistance of a 15 Member Tribal Committee to maintain the spirit of the Indian Community as well as fix inherent problems with the existing installations.

Project Award was in July of 2013 and Turn Over with water testing to be completed in June 2014.

Project required 3D Scans of existing red steel to aid in the design and installation of the new Mullionless Glazing System.

@ HEA,2013- 2014